Справочник Пользователя для Seahawks Post LDRA6

Скачать
Страница из 30
User Guide: LDRA6 
Chapter 3: Installation 
9 970 
484-6510 
www.rletech.com 
CHAPTER 3: INSTALLATION 
3-1 
BEFORE YOU BEGIN 
The LDRA6 is a wall mounted device.  To secure the device to the wall, first open the door of the 
enclosure.  There are knockouts on the top and bottom of the enclosure.  Remove as many as necessary.  
Use drywall anchors and the holes in the back of the enclosure to secure the unit to the wall. 
3-2 
CONNECTING THE WATER LEAK DETECTION CABLE 
A leader cable kit (part #LC-KIT) is required per zone to connect the LDRA6 to SeaHawk Leak Detection 
Cable (SC).  A leader cable is included in each LC-KIT; one end of this leader cable connects into the 
LDRA6.  This end of the cable is finished with stripped, bare wires.  The other end features a mating 
connector which connects with the SC cable.  The end of the cable zone requires a removable end 
terminator (EOL) which is also included in a leader cable kit (LC-KIT). 
 
 
 
 
To connect the leader cable to the LDRA6, connect the wires (4) to the appropriate zone position of the 
terminal block connectors (see section 2-1.3 for more wiring details).  Adjust the appropriate zone 
configuration for Leak Detection input (see section 2-4 for more details). 
 
Once the leader cable is plugged into the terminal block, it is ready to be connected to the SC cable.  To do 
this, unscrew the EOL terminator from the end of the leader cable.  Attach the first length of SC cable to 
the leader cable.  Route the SC cable according to the cable layout diagram, if provided.  Lay the cable 
according to figure 3-1 and section 3-2.1.  Secure the EOL terminator on the unoccupied end of the SC 
cable. 
 
 
 
 
Figure 3-1:  Water Leak Detection Cable  
 
3-2.1  Secure the Cable to the Floor  
Secure the cable to the floor with either J-clips (part #JC) or one of the other approved methods shown in 
Figure 3-2.  J-clips are the manufacturer’s recommended installation method. 
ƒ
 
Place one J-clip every three feet along the length of the SC cable.  Place one J-clip at each turn of 
the cable. 
 NOTE
:   
 
A Leader Cable Kit (part #LC-KIT) is required per zone to connect the LDRA6 to 
SeaHawk Leak Detection Cable (SC)
 Each LC-KIT includes a 15 foot (4.57m) leader 
cable and an EOL terminator.  The kits are NOT included with the LDRA6, and can 
be purchased separately.