Справочник Пользователя для Protec SX 2

Скачать
Страница из 58
6
COMPACT 2
TM
Installation
®
Installation
1. Requirements for installation
a.
Fresh water connection: Stop cock with 3/4" outer-thread diameter (washing 
machine connection), Water pressure 2 - 10 bar (29 - 145 psi).
b.
Drainage connection: Plastic tube - inner diameter 50 mm ”or larger. A ven-
tilated syphon which serves as odour preventor should be included in the 
planning. The drainage tubes should be installed with a fall of minimum 5 %. 
Local Water Authorities regulations should be complied with.
c.
Electrical connection: Fused wall socket with earth connection according to 
electrical data (see technical specifications, 
page 5
). It is also required to 
install an earth-leakage switch (with 25 A / 30 mA nominal error current).
2. Installation of processor
a.
Unpack and assemble base table/ base cabinet respectively according 
enclosed manual.
b.
Unpack Processor and mount onto base table/ base cabinet respectively 
according to manual. Remove the transport securing bars of the roller-racks. 
Fit the gear and dryer plates to the water/dryer-rack.
Electrical connections should be carried out according to reg-
ulations by an electrician.
1
6
3
2
5
8
7
4
Depending on model type the Compact 2 has either an open 
stand or like shown here a closed cabinet.
1
Machine cover
2
Light protection cover on film infeed
3
Control panel
4
Power switch and main fuses
5
Replenishment tanks
6
Stop cock of water
7
Connections for freshwater, replenishment and
drainage respective overflow
8
Levelling feet