Справочник Пользователя для Toshiba VF010H05

Скачать
Страница из 106
JKSSS+ Series - 105
JKSSS+ Series   
 
 
 
 
           
            
   2.3 - 4.2KV
JKSSS+ Series
Medium Voltage Solid 
State Soft Starters
2.3 - 4.2KV
Installation & 
Operation Manual
Chapter 1:  Introduction  ..................................................................................................... 1
 1.1 Overview
 1.2 Specifi cations
 1.3 Design 
Features
 
1.4 
Structure and Power Bus
 
1.5 
Theory of Operation
 1.6 General 
Protection
 
1.7 
Thermal Overload Protection
 1.8 Firing 
Circuit
 1.9 Electronics
Chapter 2:  Installation  ..................................................................................................... 12
 
2.1 
Receiving and Unpacking
 
2.2 
Initial Unit Inspection
 2.3 Location
 2.4 Dimensions
 2.5 Mounting
 2.6 Additional 
Equipment
 2.7 Before 
Applying 
Power
 2.8 Warnings
 
2.9 
Medium Voltage Power Connections
 
2.10 
Control Connections and JKSSS+-TCB
 2.11 
Reference 
Section
 
Chapter 3:  Start-Up   ........................................................................................................  29
 
3.1 
Preliminary Start-up Check List
 3.2 Introduction
 3.3 Acceleration 
Adjustments
 3.4 Deceleration 
Adjustments
 
3.5 
Sequence of Normal Operation
 
3.6 
Emergency Bypass Operation
 
Chapter 4:  Programming  ................................................................................................ 33
 4.1 Keypad/Operator 
Interface
 4.2 Menu 
Navigation
 
Chapter 5:  Setpoint and Programming ........................................................................... 36
 
5 .1 
Setpoints Page List
 5.2 Setpoint 
Menu
 
 
SP.1  Basic Confi guration .................................................................................................46
 
 
SP.2  Starter Confi guration ...............................................................................................47
 
 
SP.3  Phase & Ground Settings .......................................................................................50
 
 
SP.4  Relay Assignment ...................................................................................................53
 
 
SP.5   Relay Confi guration ...............................................................................................55
 
 
SP.6   I/O Confi guration ....................................................................................................56
 
 
SP.7   Custom Acceleration Curve ...................................................................................59
 
 
SP.8   Overload Curve Confi guration ...............................................................................62
 
 
SP.9   RTD Confi guration .................................................................................................63
 
 
SP.10  Set Password ........................................................................................................65
 
 
SP.11  Communications ...................................................................................................66
 
 
SP.12  System Setpoints ..................................................................................................67
 
 
SP.13  Calibration & Service ............................................................................................69
Chapter 6:  Metering Pages .............................................................................................. 70 
 
6 .1 
Metering Page List
Chapter 7:  Maintenance and Troubleshooting/Disposal/Storage  ............................... 80
 7.1 Failure 
Analysis
 
7.2 
Typical Block Diagram
 
7.3 
Overload Curve Defi nition
 
7.4 
Typical Wiring Diagram for TCB Board
 
7.5 
Typical Internal Wiring Diagram
 
7.6 
Spare Parts List
 
7.7 
Instructions for Stack Replacement
 
7.8 
Instructions for Low Voltage Test
 
7.9 
Maintenance Program/Servicing Equipment/Disposal/Storage
 
Warranty and Limitations of Liability  ............................................................................. 99