Справочник Пользователя для King Technology Swimming Pool Filter 5450

Скачать
Страница из 16
COPPER PIPE
In-line Installation
PVC
CEMENT
Corrosion
Resistant Check
Valve
Water
CYCLER
Metered
Pool Purifier
PVC
CEMENT
1.
2.
3.
4.
14
MATERIALS NEEDED
PVC Cement
#10 
X
 1 1/4" Phillips Pan
Head Screws with
Washers
RECOMMENDED
Use Phillips pan head
screws through the
mounting holes at the
POOL FROG
®  
Cycler
bases to secure the
POOL FROG
®   
XL PRO
into a treated wood
base.
Bi-flow valve design
allows water flow in
either direction.
TOOLS NEEDED
Pipe Wrench
Hacksaw
Measure the distance
between outside male
adapters and cut out a
section of pipe 3” less than
that dimension.
Insert PVC pipe into male
adapters with a twisting
action. Hold in place 5 to
10 seconds to bond.
Isolating the POOL FROG
®  
XL PRO by installing a
corrosion resistant check valve is recommended.
Tape Measure
Following PVC cement directions brush PVC cement on
the inside of the male adapters and to ends of the pipe .
Do NOT install
POOL FROG
®
XL PRO off-line.
Do NOT install in copper pipe
if using POOL FROG
®
 Pac as
chemical corrosion occurs.
Install unit after all equipment and as far as possible from heater.
Allow a minimum of 12" above and on each
side of 
POOL FROG
®   
XL PRO to ensure
room for easy replacement of 
POOL FROG
®
Mineral Reservoir and 
POOL FROG
®
 Pac.
Minimum
12" to side
Minimum
12" to side
Minimum
12" above
opening
Minimum
12" above
opening