Справочник Пользователя для Iveco S30 ENT M23

Скачать
Страница из 54
installation directiVe
26
MAY 2006
S30 ENT M23 
10. MAIN ANALOG INSTRUMENT PANEL
Installation  of  the  IVECO  MOTORS  onboard  panel  with 
analog  indicators  entails  connecting  the  panel’s  JC  connec-
tor to the JB connector on engine wire harness, interposing 
the appropriate extension wire harness available in 3, 5 and 
7 meter-long versions. The JC-JB wire harness comprises 47 
lines, each connected to the terminal identified on both con-
nectors by the same number.
To the main panel is connected the JE connector, provided 
for connection to the secondary panel; in installations with 
no secondary panel, do not remove the cap of the JE con-
nector to avoid compromising the electrical continuity of the 
systems’ power supply circuit.
To allow the work of the fuel filter clogging alarm (SIFC), in 
the indication alarm module, it has to disconnect the connec-
tor (12) fitted close to JC.
Figure 2
1. Coolant temperature gauge (TA) - 2. Revolution counter and hour counter (CG) - 3.Voltmeter (V) - 4. Buzzer (SA) - 5. Indication 
and alarm module (MS) - 6. Engine oil pressure gauge (MO) - 7. Connector for secondary instrument panel (JE)- 8. On board panel 
instrument light switch (L) - 9. Engine start/stop key switch (CA) -10. Engine stop push-button (usable only with electric harness 
versions with excitation engine stop) - 11. Sound alarm inhibition push-button (P1) -12. SIFC Alarm abilitation connector - 
13. Connector for main panel wiring (JC) - 14. Cap with electrical continuity connection.

oF
oC
V
bar













06_002_S
1
13
2
3
4
5
6
7
11
10
9
8
14
12