Справочник Пользователя для Iveco S30 ENT M23

Скачать
Страница из 54
installation directiVe

MAY 2006
S30 ENT M23
4.  GENERAL INSTALLATION CRITERIA
Accessibility 
The engine must be located in such a way as to allow filling 
and draining engine liquids when doing servicing operations. 
Anchoring 
If  anchoring  is  accomplished  by  interposing  shock  mounts, 
they must be able to support the engine’s mass and the lon-
gitudinal thrust exerted by the propeller shaft in motion. 
If rigid mounting is adopted, particular care must be given to 
support alignment and co-planarity.
Information on dimensions and fastening values are provided 
in the “Installation Diagram”.
 
Combustion and ventilation air
Compliance  with  prescriptions  on  the  quantity  of  air 
required  for  combustion  and  ventilation  assures  a  regular 
operation  of  the  engine  even  in  adverse  conditions  and  it 
enables to deliver its maximum design power (1).
Sea water line
It  must  be  provided  with  an  intake  capable  of  preventing 
the entry of foreign bodies into the suction pipes. Between 
the intake and the pump, it is best to interpose a gate to be 
closed  in  emergencies  or  for  extended  idle  periods  and  a 
filter to stop the smaller impurities; it is also recommended 
to  install  a  suitably  dimensioned  and  easily  replaced  zinc 
anode.
The engine sea water line was provided by the manufacturer 
with protection anodes to be replaced periodically.
The rubber hoses positioned along the pipeline shall be suffi-
ciently rigid not to create choked areas caused by crushing (1).
Engine pre-heating
If  the  engine  usage  profile  requires  immediate  delivery  of 
power at the highest rpm’s, it is recommended to install an 
auxiliary pre-heater on the closed cooling loop.
Exhaust gas discharge 
The  exhaust  gas  discharge  conduit  shall  be  compliant  with 
the guidelines contained in the IVECO MOTORS publication 
“Guide to the installation of marine engines”; it also provides 
indications to compute the dimensions of the exhaust pipe-
lines, which is the Yard’s responsibility.
Electric - electronic equipment
Provide a suitable arrangement of the engine control elec-
tronic  unit,  of  the  relay  box  and  of  the  possible  optional 
electronic units, referring to the dimensions and position of 
the wire harnesses and their connectors.
Both units must be anchored in such a way as to dampen the 
vibrations and stresses undergone by the hull while under-
way and/or induced by the engine’s operation.
(1)  The  EDC  engine  electronic  control  is  programmed  to 
reduce  maximum  deliverable  power  if  the  operating 
parameters  measured  by  the  sensors  show  that  criti-
cal conditions have been reached, and if exceeded the 
engine could be damaged.