Справочник Пользователя для Hughes HN7700S

Скачать
Страница из 140
Chapter 1 • Introduction
 
4
1037753-0001  Revision A
Installation and 
commissioning steps
The installation and commissioning of the HN router is a 
multi-step process involving two pieces of equipment—the HN 
router and the associated transport device. The workflow and 
chapter reference numbers for the process steps follow. 
1. Preparing, installing, and commissioning the transport device
a. ADTRAN Total Access 600R
b. Siemens 4100/4101 DSL Modem
2. Preparing the router for installation
3. Assembling the HN router 
4. Connecting the router to the transport device
5. Commissioning the HN router
6. Verifying the installation, commissioning, and connections
Contact information
If you experience installation problems with the HN Router, first 
try the Diagnostic Utilities on page 51.
For warranty or repair support, the contact information varies 
depending on the location. If the customer needs service, 
warranty or repair support, they should contact their customer 
service representative in accordance with their service agreement.