Справочник Пользователя для HSM Paper Shredder HSM FA 500.2

Скачать
Страница из 20
6
 
 
0702
FA 500.2
5. Transportation, 
installation
•  During transport, observe the high centre of gravity of 
the paper shredder!
•  Place the pallet with the shredder in its packaging on 
a smooth, level surface.
•  Observe the instructions for unpacking.
•  If you need to move the shredder through narrow 
doors, you can wait until it is at its fi nal location before 
fi tting the loading tray. Without the tray, the machine is 
only 880 mm wide.
•  The shredder may only be placed in dry rooms on a 
hard, level fl oor –  not on carpets. The fl oor load on 
each roller is approximately 180 kg.
•  The machine must be connected to a power source 
which meets the specifi cations on the nameplate. 
Make sure the power cable is unobstructed and that 
nobody can tread on it
Mount the loading table onto the unit:
•  Remove screws (1) and (2) from the frame.
•  Fasten the supports to the frame with the screws (2).
•  Place the table on the supports. Make sure the oil 
hose is not bent. Fasten the table above (1) to the 
frame.
•  Screw the table on with the hexagon bolts (1) also at 
the bottom of the frame and fasten to the supports 
with the bolts (3) and nuts (4).
Mount the oil hose onto the unit:
•  Guide the hose through the recesses in the table to 
the oiler and shorten the hose.
2
2
2
1
1
1
1
3, 4