Power, electrical, and controls  30 
 
Redundant power installation (2N load)—Four busways are powered from one power feed, and the 
remaining four busways are powered from a different power feed. 
 
 
Drop boxes 
The internal electrical busways provide a location to connect each of the drop boxes, which then power the 
PDUs. Stagger the drop boxes on the electrical busways by connecting one drop box to busway #1 and 
connecting the next drop box to busway #2. A staggered configuration enables load balancing with the rack 
equipment and is necessary to ensure redundancy. 
Side view shown 
 
Disabling power 
 
To disable power to a single PDU, open the drop box breaker that powers the PDU, and then disconnect 
the PDU from the drop box. 
 
To disable power to a single rack, open the drop box breakers that power each of the PDUs installed 
in that rack. 
 
To disable power to a single busway, open the appropriate breaker for that busway on the 
corresponding electrical busway panel on the HP POD 40c G2 exterior.