Справочник Пользователя для Galaxy Metal Gear 65

Скачать
Страница из 258
Introduction
7
• Expansion Port 1 Rx Good (Green)
• ESI/LRC module fault LED (Amber) 
• Cache Active (Green)
• RAID Controller Activity
– Ready (Green)
– Host Activity of either host channels (Flash off)
• Battery Fault (Amber)
Important
Fitting of a RAID controller to the LRC module is a factory only operation.
Figure 1–7
LRC Panel Layout