Справочник Пользователя для Burnham Indirect - Fired Water Heater AL SL

Скачать
Страница из 24
7
q
Run all 24VAC wiring thru the square notch on bottom of TPI case.  
(See TPI Diagram 3)
q
Incoming 24VAC power must be connected to 24VAC connectors on the bottom right corner of TPI  
    control. 
 (See TPI Diagram 3)
q
Connect control wiring to PUMP/TT normally open relay connections (rated for both 24V and 110V  
    wiring) on the bottom left corner of TPI control. 
 (See TPI Diagram 3)
q
All and only 110VAC wiring must go through an appropriate chase nipple installed in the knockout at  
    bottom of TPI case.
q
Be certain to replace TPI cover using Black Screw provided.
A. INSPECTING AND PREPARING THE WATER HEATER
q
Remove the cardboard box, which comes packaged with the heater.  It should contain the following:  
    TPI thermostat, T&P valve and a “Tee”, foamed lid and screws.
B. LOCATION
q
Solid foundation and dry location.
q
Protect heater water lines from freezing.
q
Area free of flammable vapors.
q
Sufficient room to service heater.
q
Not in close proximity to wood burning stove.
q
Where leak will not damage property. 
 
C. PROTECTION FROM WATER DAMAGE
q
Be sure to make provisions to protect area from water damage if a leak should occur in the  
    tank or connected fittings.  
 
D. RELIEF VALVE
q
Warning: Improper installation will present potential hazard to life and property.
q
Check to be sure that proper relief valve requirements are met.
q
T&P installed as shown in Figures 1 and 2.
q
3/4” discharge pipe – properly protected from freezing and restrictions.
q
No valve between tank and relief valve or in drain line.
q
Provision for hot water discharge from relief valve. 
 
E.  INSTALLING THE REMOVABLE HEAT EXCHANGER
q
Heat Exchanger is installed at the factory except for the AL119SL.  The following is provided for ser- 
    vicing.
q
Insert heat exchanger with plastic o-ring housing.
q
WARNING:  Plastic o-ring housing must be installed properly.  (See Figure 3).
q
For proper installation of Heat Exchanger 
See Figure 3.
F.  WATER SUPPLY CONNECTIONS  (See Figure  & ).
q
Do not over tighten brass threads.
q
Mark the water shutoff for future reference.
INSTALLATION CHECKLIST