Справочник Пользователя для White Mountain DVP36FP3(0,1,2,3)-3 NAT

Скачать
Страница из 68
23340-4-0608
Page 63
CAUTION: ALL WIRING SHOULD BE DONE BY A QUALIFIED ELECTRICIAN AND SHALL BE IN COMPLIANCE 
WITH ALL LOCAL, CITY AND STATE BUILDING CODES. BEFORE MAKING THE ELECTRICAL CONNECTION, 
MAKE SURE THAT MAIN POWER SUPPLY IS DISCONNECTED. THE APPLIANCE, WHEN INSTALLED, MUST BE 
ELECTRICALLY GROUNDED IN ACCORDANCE WITH LOCAL CODES OR, IN THE ABSENCE OF LOCAL CODES, 
WITH THE NATIONAL ELECTRICAL CODE ANSI/NFPA 70 (LATEST EDITION).
1.  Using gloves, unpack liner components and check for damaged 
or missing components.
2.  Lower bottom louver and remove upper louver on fireplace.
3.  Remove glass frame assembly from fireplace.
4.  Remove rear logs from burner assembly.
5.  Place brick panel (rear) against rear wall in fireplace.
Note
: The top edge will have a half-moon cutout relief to match 
up with the rear flue vent hole.
6.  While holding finished edge on brick panel (side), place brick 
panel (sides) against side walls in fireplace. Move side panels 
rearward until the back edge meets the rear brick panel. Slide 
side brick panels down so they rest on firebox bottom.
7.  Align grout lines on top brick panel with the grout lines on the 
side brick panels. Place the top brick panel into brick panel 
holder. With needle-nose pliers, carefully bend hold-down tabs 
on brick panel holder over the edges of the top brick panel. 
The hold-down tabs will securely hold the top brick panel in 
place.
8.  Replace  rear  logs  onto  burner  assembly.  (Refer  to  log 
placement, page 40.)
9.  Attach glass frame assembly onto fireplace.
10. Raise bottom louver and replace top louver onto fireplace.
11. Installation of optional brick liner is complete.
*Note:  For intermittent pilot models, refer to wiring instructions on page 46.
*
A  factory  installed  junction  box  is  located  on  the  lower  right  
side of the fireplace. Wiring must be fed to the junction box and 
attached to the receptacle that is provided. Leave approximately 
6" of wire in the junction box for connection.
Attach black wire to one side of the receptacle and white wire to 
opposite side of receptacle. The ground wire should be attached to 
the green (ground) screw.
Install the receptacle into the junction box. Attach cover plate.
Attention:  A  Junction  box  is  located  on  the  lower  left  
side of the fireplace for direct ignition connections on direct ignition 
fireplace models only.
JUNCTION BOX WIRING INSTALLATION INSTRUCTIONS
OPTIONAL BRICK LINER INSTALLATION INSTRUCTIONS