Инструкция С Настройками для Burnham ES2 ES2

Скачать
Страница из 52

  THE BOILER IS TOP-HEAVY.  Do not 
             allow it to tip over.
1.
  Remove the sleeve. 
2.
  Remove the contents from the skid, except 
the boiler.
3. 
Remove the four (4) hex-drive lag screws 
holding the boiler to the skid (Figure 1-a).
1.  UNPACk THE CRATE
4. 
Tip the boiler and shimmy it off the skid.
2.  POSITION THE BOILER
  
WARNINGS
1.
  Slide the boiler into desired location.
2.
  Meet the minimum clearances to 
combustible construction per the 
Specification Section of this manual.
OBSERVE MINIMUM CLEARANCES to 
combustible walls  and ceilings to avoid potential 
fire hazard.
DO NOT INSTALL ON CARPET.  This may cause 
a fire.
INSTALLING THE BOILER NEAR A SOURCE OF 
FLAMMABLE LIQUIDS or gases may cause fire or 
explosion.
CLEAN BURNERS DAILY if operating the boiler in 
a dusty environment.
PROTECT IGNITION SYSTEM COMPONENTS 
from sources of water that may spray, drip, or rain 
on them during installation or service.
3.
  Allow 24" service clearance in front and on 
the left side of the boiler.
4.
  Level the boiler, using shims as necessary.
1-b
1-a