Справочник Пользователя для U.S. Department of Defense Test Sets Electron Tube TV-2A/U

Скачать
Страница из 82
Section IV.
Section I.
II.
Short test _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Interelement leakage test _ _ _ _ _ _ _ _ _ _ _ _ _ 
Filament continuity test _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Transconductance test _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Gas test _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Emission test _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Voltage regulator and gas rectifier test _ _ _ _ _ _ 
Procedure for reading plate current (less than
50 milliamperes) of triode tubes.
Thyratron test _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 
Electron-ray indicator test _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Ballast tube test _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Indicator lamp test _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Complete tube test _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Stopping procedure _ _ _ _ _ _ _ _ _ _ _ _ _ _ 
PERATOR’S MAINTENANCE
General _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Preventive maintenance_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Visual inspection _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Operational checklist _ _ _ _ _ _ _ _ _ _ _ _ _
Removal and replacement of chassis _ _ _ _ _ _ _ _ _ _ _ _
Tube replacement _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Preferred-type tubes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Replacement of fuses and lamps _ _ _ _ _ _ _ _ _ _ _ _
ORGANIZATIONAL MAINTENANCE
General _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Tools and materials require _ _ _ _ _ _ _ _ _ _ _ _ _ _
Preventive maintenance _ _ _ _ _ _ _ _ _ _ _ _
Visual inspection _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Equipment performance checklist _ _ _ _ _ _ _ _ _ _ _ _ _
Replacement of test adapters _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
SHIPMENT, LIMITED STORAGE, AND
DEMOLITION TO PREVENT ENEMY
USE.
Shipment and limited storage
Disassembly of equipment _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Repackaging for shipment or limited storage   
Demolition of materiel to prevent enemy use
Authority for demolition                                                    
Methods of destruction  _ _ _ _ _ _ _ _ _
REFERENCES_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
MAINTENANCE ALLOCATION _ _ _ _ _ _ _ _ _ _ _ _ _
BASIC ISSUE ITEMS LIST _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
- -
- -
- -
64
2