Справочник Пользователя для U.S. Department of Defense Test Sets Electron Tube TV-2A/U

Скачать
Страница из 82
Section II. OPERATORS CONTROLS AND INDICATORS
incorrect operation of the PRESS TO TEST switches may damage
the tube under test. Be sure that all the controls and switches are
set properly before inserting the tube in the socket.
a .   C o n t r o l s .
Control
ON-OFF switch . . . . . . . . . ..........
PRESS TO TEST (switches P1
through P6).
SHORT TEST (6-position rotary
switch ).
FUNCTION (3-position rotary
switch).
Note. On some equipment
is marked LEAKAGE VR.
this switch
Seven SELECTORS switches:
FIL- and FIL+ 12-position
rotary switches.
GRID (12-position rotary switch) -
Function
In ON position, applies ac power to unit.
Depending on type of test selected, de-
pressing one or more switches applies
power to tube under test.
In OPER. position, permits all tests ex-
cept short test. By turning switch
successively through positions V, W,
X, Y, and Z, various tube electrodes
are tested for interelement shorts.
Switch
position
Action
TEST ---------- Permits all types of tube
tests except voltage reg-
ulator and leakage tests.
VR--------------- Permits tests of thyra-
trons and voltage regu-
lator tubes in conjunc-
tion with PRESS TO
TEST P5 switch.
LEAK . . . . Permits determining in-
terelement leakage in
megohms as indicated
by PLATE meter.
Turning each of the filament switches to
one of positions 1 to 9 connects fila-
ment voltage to correspondingly num-
bered base pin of tube under test. (0
is no connection.)
Turning the switches to position A or B
connects filament voltage to A or B
electrical clip, respectively.
When set to one of positions 1 to 9, con-
nects grid bias and signal voltage to
correspondingly numbered base pin of
tube under test. (0 is no connection.)
In A or B, connects grid bias and
signal voltage to A or B electrical clip.