Справочник Пользователя для Bryan Boilers AH-FS151250D

Скачать
Страница из 17
B O I L E R   F E E D   S Y S T E M  
D A T E :   4 / 3 / 0 3  
R E P : 2 / 1 / 9 9  
 6
       Section 
START-UP AND OPERATION – 
BOILER FEED SYSTEM 
WARNING: 
IMPROPER SERVICING AND START-UP OF THIS EQUIPMENT MAY CREATE A POTENTIAL 
HAZARD TO EQUIPMENT AND TO OPERATORS OR PERSONS IN THE BUILDING. 
SERVICING AND START-UP MUST BE DONE ONLY BY FULLY TRAINED AND QUALIFIED 
PERSONNEL. 
 CAUTION: 
BEFORE DISCONNECTING OR OPENING ANY FEED SYSTEM ITEMS OR ACCESSORIES, OR 
BEFORE CLEANING OR REPLACING PARTS OF ANY KIND TAKE THE FOLLOWING PRECAUTIONS: 
 
• 
Turn OFF and lockout all electrical disconnects to the feed system and any other 
equipment or systems electrically interlocked with the unit. 
• 
All cover plates, enclosures, and guards must be in place at all times except during 
maintenance and servicing.                                                                                                                
• 
Close all valves to stop any water or steam from entering the feed system during 
maintenance or servicing 
 
OPTIONAL CONTROLS MAY HAVE BEEN SUPPLIED WITH THIS UNIT THAT ARE NOT 
ADDRESSED IN THIS SECTION. PLEASE REFER TO THE FEED SYSTEM EQUIPMENT LIST, 
DIMENSIONAL, AND/OR ELECTRICAL DIAGRAM FOR THEIR PURPOSE AND THEIR 
MANUFACTURER’S LITERATURE FOR PROPER TESTING PROCEDURES. 
 
2.1 LIMIT TEST 
2 . 1 . 1   P R O T E C T I V E   D E V I C E S  
All operating and limit controls, and low water cutoffs must be tested for proper operation before 
start-up.