Справочник Пользователя для Bryan Boilers AH-FS151250D

Скачать
Страница из 17
B O I L E R   F E E D   S Y S T E M  
D A T E :   4 / 3 / 0 3  
R E P : 2 / 1 / 9 9  
 1
Section 
Installation Instructions –      
Boiler Feed System 
Note:  Please read the entire instruction manual before attempting installation. 
Insurance and local or state regulatory codes may contain additional or more stringent 
requirements than those contained in this manual.  Installation must conform to these codes and 
any other authority having jurisdiction. 
Appropriate sections of the National Electric Code and ASME Code should be consulted and 
followed. 
1.1 FOUNDATION 
Before uncrating, the location should be prepared. The boiler feed system should set upon a good 
level concrete floor. If the unit is not level or the floor is not in good condition, a concrete 
foundation should be built, the dimensions being larger than the outside dimensions of the boiler 
feed system base.   
1.2 CLEARANCES 
NOTE 
Adhere to all applicable local codes and NEC regarding system feed system installation and 
clearances. 
The unit may need room for service accessibility and clearances for piping and electrical 
connections.  Local codes must be applied to specific installations and the minimum clearances 
established accordingly.  If an electrical panel is supplied, the NEC requires a 36” service 
entrance in front of the electrical panel. 
1.3 UNCRATING THE BOILER FEED SYSTEM 
Leave the packaging material used for crating in place until ready for installation.  The crating is 
not designed for outdoor storage; therefore the unit should be stored inside.  Uncrate the boiler