Руководство По Настройке для Zephyr AK7136ASBF
![Zephyr](https://files.manualsbrain.com/attachments/565fe8a486ba1d536066ed7aaca7337168601921/common/fit/150/50/fffe26e9186ae104414a60fd6a1808f0f17d5128b734ee4e44d87f794b4d/brand_logo.png)
Installation –
Preparing Duct Location
10
www.zephyronline.com
Note: If using hood in recirculating mode skip these steps and turn to page 11.
Vertical Ducting
(7" Round)
Vertical Ducting
(3-1/4"x10" Rectangular)
1. Using a fl at-head screwdriver, remove both the
rectangular and round knock-out plates located on
top of hood
rectangular and round knock-out plates located on
top of hood
1. Using a fl at-head screwdriver, remove only the
rectangular section of the knock-out plate located
on top of hood.
rectangular section of the knock-out plate located
on top of hood.
1. Using a fl at-head screwdriver, remove the
rectangular knock-out plate located on back of
hood.
rectangular knock-out plate located on back of
hood.
2. Secure 3-1/4" x 10" rectangular collar to top of
hood using (6) M4 x 8 screws.
hood using (6) M4 x 8 screws.
2. Secure 3-1/4" x 10" rectangular collar to back of
hood using (6) M4 x 8 screws.
hood using (6) M4 x 8 screws.
2. Secure 7" round collar to top of hood using
(6) M4 x 8 screws.
(6) M4 x 8 screws.
Horizontal Ducting
(3-1/4"x10" Rectangular)
1
6
2
5
3
4
1
6
2
5
3
4
1
6
2
5
3
4