Руководство По Настройке для Zephyr AK7500BS
14
www.zephyronline.com
5. Knock out plate A for dual blower horizontal
ducting.
6. Position dual blower inside hood body. Attach by
VFUHZVSUHYLRXVO\UHPRYHGIURPVWHS
7. Attach top cover plate to top of hood body using
[VFUHZV
8. Attach 10 inch round blower collar to back of
KRRGXVLQJ0[VFUHZV&RQQHFWEORZHU
wire extension cable to new blower and connect
both plugs from each blower to female plugs
behind switch panel.
wire extension cable to new blower and connect
both plugs from each blower to female plugs
behind switch panel.
A
Installation –
PBD-1200A
Dual Blower Horizontal Ducting
Follow Steps 1 through 4 on page 13, then continue PBD-1200A horiztantal ducting installation by following the
steps
steps
below.