Инструкции Пользователя для Zephyr ZAZE42BS

Скачать
Страница из 50
10
www.zephyronline.com
FRONT
FRONT
FIG. C
FIG. E
5.  Lift support frame assembly up to the ceiling making sure the the word “front” on the top support frame faces the 
front of the hood where the controls will be located (FIG. D).  The key-holes on the top support frame should cover 
the wood screws previously installed in the ceiling.  Slide support frame towards narrow end of key-holes to lock 
the frame in place. 
6.   Install the last (2) 1-1/2” wood screws with washers into the two remaining corners of the top support frame to 
secure it to the ceiling. Tighten all screws.  
Installation – 
Mounting the Hood
FIG. D
3.  For extension duct cover hood heights between 50” to 80”, the 
support frame requires lateral support brackets (supplied with 
extension duct cover kit) to be installed to the two top support 
frame cut off arms and their corresponding bottom support frame 
arms. Install lateral support brackets by (12) M4 x 8 sheet metal 
screws supplied with extension duct cover kit. (FIG. C)
4.  For standard duct cover hood heights between 45” to 50”, the 
support frame requires a square support bracket to be installed 
inside the support frame. Install square support bracket to top 
support frame arms by (8) M4 x 8 sheet metal screws. (FIG. E, 
#1) Top support frame arms extend past lower support frame 
bracket with shorter hood heights. (FIG. E, #2) 
2
1
FOR USE WITH EXTENSION 
DUCT COVER KIT ONLY