Руководство По Установке для Fagor 60CFP
9
2/ INSTALLING YOUR APPLIANCE
INSTALL THE HOOD
Note: at least two people will be required to mount the hood.
1.
Raise the hood into its mounting position.
2.
Align the rectangular opening on the back of the
hood with the wall-mounting bracket. Gently lower
the hood until it securely engages the bracket.
hood with the wall-mounting bracket. Gently lower
the hood until it securely engages the bracket.
3.
Open the Al. filter and find the
two Ø
8 mm holes on
the back of the hood. Level the hood with 2 mounting
screws (4*30mm) with washer. Use drywall anchors
provided.
screws (4*30mm) with washer. Use drywall anchors
provided.
4.
Measure the height of the slide duct fixing support.
Adjust the height of the chimney according to the
height. Then use the duct fixing support with two
screws (4x8mm) to fix the chimneys. Shown as in the
pic.
Adjust the height of the chimney according to the
height. Then use the duct fixing support with two
screws (4x8mm) to fix the chimneys. Shown as in the
pic.
5.
Put the chimney on the hood, use two screws (4x8mm)to
fix the chimney to the duct fixing support.
fix the chimney to the duct fixing support.
6.
Use the other two screws (4x8mm) to fix the bottom of
chimney.
chimney.
7.
After adjusting the position, open the filter and fix the
body inside with safety screws
body inside with safety screws
(4X30MM).
EN
4x8mm