Инструкции По Установке для Monogram ZV30SSFSS

Скачать
Страница из 16
15
Installation Instructions
STEP 8 INSTALL IMPLEMENT
RODS
• Use a flat blade screwdriver to install stand-offs into
the bottom of the hood.
• Align implement rod to stand-offs with the screw hole
towards the inside of the hood. Secure the rod to the
stand-offs with the supplied Allen wrench.
• Follow the same procedure on the opposite side.
Screw
Stand-offs
Into
Hood
Use Allen
Wrench to
Secure Rod
to Stand-offs
FINALIZE INSTALLATION
• Install the supplied infrared bulb(s).
• See the Owner’s Manual for instructions to test
operation.