Справочник Пользователя для Mitsubishi Electronics FR-E5NC

Скачать
Страница из 61
INVERTER SETTING
11
3) Connection example
CC-Link
master unit
PLC remote I/O station
(1 station occupied)
Inverter 1
(CC-Link unit)
Remote device station
Inverter 2
(CC-Link unit)
Remote device station
Inverter 3
(CC-Link unit)
Remote device station
Station 02
Station 01
Station 03
Station 04
Number of units connected is 4.
Station 00
Note:
One inverter occupies one station (one remote device station)
3.1.2  Setting of the transmission baud rate setting switch
Set the transmission speed.
(For details, refer to the CC-Link master unit manual.)
Setting Switch
Transmission Speed
0
156kbps
1
625kbps
2
2.5Mbps
3
5Mbps
4
10Mbps
5 or later should not be used.
(If the switch is set to position 5 or later, the "L.ERR" LED is lit and a communication error occurs.)