Справочник Пользователя для Mitsubishi Electronics AD75P1/P2/P3

Скачать
Страница из 212
 
 
 
11 - 31                                                                                                                                                       11 - 31 
MELSOFT
11. POSITIONING DEBUGGING 
 
11.2.3 Positioning start test (Current value change test) 
PURPOSE
 
 
Enter the test mode during operation monitor, and make the start test and current 
value change test with the specified positioning data No. on an axis basis. 
With the positioning data start test, you can check the control method, address, 
command speed, etc. of the positioning data. 
Also, positioning starts as the object of the speed change test. 
With the current value change test, you can clear the feed address after JOG 
operation and test the software stroke limit. 
 
BASIC OPERATION
 
 
1. Perform the basic operation in Section 11.1.2 to start operation monitor. 
2. Click the [Online] 
→ [Test] → [Test start] menu ( 
 ). 
3. Click the "OK" button in the test mode start confirmation dialog box. 
4. Click the "Ope. Test" button on the operation monitor main screen. 
5. Start the positioning start test or current value change test in the Test data set 
dialog box. 
6. To end the positioning start test, click the [Online] 
→ [Test] → [Test start] menu ( 
 ). 
7. Clicking the "OK" button in the test mode end confirmation dialog box returns to 
the operation monitor status. 
 
DISPLAY/SETTING SCREEN