Справочник Пользователя для Mitsubishi Electronics AD75P1/P2/P3

Скачать
Страница из 212
 
 
 
11 - 36                                                                                                                                                       11 - 36 
MELSOFT
11. POSITIONING DEBUGGING 
 
11.2.5 OPR test 
PURPOSE
 
 
Make the OPR test to correct the OPR basic and extended parameters and set up 
the original point. 
 
BASIC OPERATION
 
 
1. Perform the basic operation in Section 11.1.2 to start operation monitor. 
2. Click the [Online] 
→ [Test] → [Test start] menu ( 
 ). 
3. Click the "OK" button in the test mode start confirmation dialog box. 
4. Click the "Ope. Test" button on the operation monitor main screen. 
5. Click the <<OPR>> tab in the Test data set dialog box. 
6. Perform the OPR test. 
7. To end the OPR test, click the [Online] 
→ [Test] → [Test start] menu ( 
 ). 
8. Clicking the "OK" button in the test mode end confirmation dialog box returns to 
the operation monitor status. 
 
DISPLAY/SETTING SCREEN