Справочник Пользователя для Mitsubishi Electronics QD75D

Скачать
Страница из 768
6 - 35
MELSEC-Q
6   SEQUENCE PROGRAM USED FOR POSITIONING CONTROL
 Position control operation timing and process time
t1
t2
t3
t4
t5
t2
t6
Cd. 7 M code OFF request
Waiting
Controlling position
Waiting
BUSY signal
Output pulse to external source 
(PULSE)
Positioning operation
Md. 26  Axis operation status  
Cd. 7  M code OFF request
Positioning start signal
[Y10, Y11, Y12, Y13]
[XC, XD, XE, XF]
M code ON signal 
(WITH mode) [X4, X5, X6, X7]
Start complete signal
[X10, X11, X12, X13]
M code ON signal
(AFTER mode)
[X4, X5, X6, X7]
[X14, X15, X16, X17]
Positioning complete signal
OPR complete flag 
[ Md. 31 Status: b4]
Fig. 6.10 Position control operation timing and process time
 
When the positioning start signal turns ON, if all signals marked with an
asterisk ( ) are already ON, the signals marked with an asterisk ( ) will turn
OFF when the positioning start signal turns ON.
Normal timing time                                                                      Unit: ms
t1
t2
t3
t4
t5
t6
1.2 to 2.3
0 to 1.8
0 to 1.8
2.7 to 4.4
0 to 1.8
Follows
parameters
 The t1 timing time could be delayed depending on the operating conditions of
the other axis.