Справочник Пользователя для Mitsubishi Electronics QD75D

Скачать
Страница из 768
11 - 6
MELSEC-Q
11   MANUAL CONTROL
 JOG operation timing and processing time
The following drawing shows details of the JOG operation timing and processing
time.
Reverse run JOG start signal
                      [Y9, YB, YD, YF]
BUSY signal  [XC, XD, XE, XF] 
Forward run JOG start signal
                      [Y8, YA, YC, YE] 
t2
Standing by
In JOG operation 
t1
t3
t4
Pulse output to an 
external source (PULSE)
Positioning operation 
Positioning complete signal
                    [X14, X15, X16, X17]
Md. 26 Axis operation status 
ON
ON
OFF
OFF
OFF
OFF
Standing by
Fig. 11.5 JOG operation timing and processing times
Normal timing times                                           Unit: ms
t1
t2
t3
t4
1.0 to 3.0
0 to 1.8
2.7  to 4.4
0 to 1.8
 Delays may occur in the t1 timing time due to the operation status of other axes.