TOOLS REQUIRED 
-1/4" Allen wrench 
-1/2" Open end wrench (2) 
-4-45-3 (accessory item) 
-Torque wrench 
      
Removal 
 
1.     Remove the eight bolts securing 
the 
material 
head (ref# 21) to the hydraulic head 
(ref# 59). 
2.     Remove  the  material  head 
c u s h i o n 
(ref# 22) and replace with the new 
c u s h i o n 
provided. 
3.     Place a container under pump to 
catch hydraulic 
oil.  
4.     Gen tl y  pull   h ydrapul s e 
membrane  to 
separate it from the hydraulic head. 
5.     Remove the nut (ref# 58) on the 
h y d r a p u l s e 
membrane stem in order to separate 
the  hydrapulse 
        membrane  from  the  hydraulic 
plastic 
horn 
(ref# 55), hydrapulse membrane spring (ref# 56), and spring   locator (ref# 57). 
6.     Clean all parts. 
 
Assembly 
 
1.     Place hydraulic plastic horn over the new hydrapulse membrane. 
2.     Position the spring in the bore of the plastic horn. 
3.     Install the spring locator over the hydrapulse membrane stem and into the spring. Thread the new jam 
        nut onto the stem. 
4.     Tighten the jam nut until a measurement of 1-5/16” is obtained. The measurement is taken from the 
        top of the hydraulic horn (ref# 55) to the top of the spring locator ( ref# 57). See diagram above.  
5.     Check the assembly. The spring must be positioned in the bore of the plastic horn on one end and over 
        the shoulder of the spring locator on the other end. 
6.     Place the hydrapulse membrane assembly back into the hydraulic head. 
7.     Re-install the material head with the eight bolts. Torque to 30 ft. lbs. 
8.     Refill hydraulic oil tank and "PURGE" system following instructions on page 18.  
9.     Prime the pump with solvent or water and bring the pump up to full pressure (approximately 2500 psi.). 
        Run the pump on standby ( not triggering gun ) for about 20 minutes, to “break-in” new membrane.  
10.   Installation is now complete and the pump is ready for use. 
 
 
                                             
REPLACEMENT OF INTAKE SEAT 
                                                           (REF # 13) 
 
 
 
 
 
1-5/16 Inches 
58 