Справочник Пользователя для HP (Hewlett-Packard) A3312AZ

Скачать
Страница из 149
 
 
 
 
 
Installation & Configuration 
Powering-On the Storage System 
 
 
 
25 
 
 
 
 
 
 
 
Installation
 
Powering-On the Storage System 
CAUTION!   The storage system should be powered-on first to allow access to all filesets 
during the boot process. The disk modules in the four upper slots have delayed spin-up, 
so if the boot process starts before all the disks are online, some of the filesets may not 
be mounted. 
 
CAUTION!   Do not operate the storage system if it has been exposed to temperature 
extremes. Damage to the disk and tape modules may occur if the storage system does 
not stabilize at room temperature for two hours before operation. 
To power-on the storage system: 
1. Lift the storage system power switch cover if the front door is closed. 
2. Press in the storage system power switch to the power-on position. 
3. A3312A/12AZ Only: Press the cabinet power switch to the power-on position (see Figure 58). 
4. The storage system will perform the power-on sequence (see “Power-On Sequence”). 
Power-On Sequence 
1. The four lower storage modules power-on and begin simultaneous self-tests for approximately 20 
seconds. 
2. The four upper storage modules power-on and begin self-tests in the order of their SCSI IDs. The disk 
module status lights are green. 
3. When the self-tests have completed, the disk module status lights and DDS tape module status lights 
will be off.