Справочник Пользователя для Lucent Technologies Release 8.2
Configuration 4: R8csi <—ISDN—> R8si Gateway
<—ppp—> R8csi
<—ppp—> R8csi
143
Administration for Network Connectivity
555-233-504 — Issue 1 — April 2000
CID: 77730
3
C-LAN Administration
Switch 3 Task — Assign Processor Channels
This task associates data links (hardware) with processor channels (software) on
Switch 3.
Switch 3.
Begin
Steps
>
Open the Processor Channel Assignment form — enter
ch com p
.
> Enter values
change communications-interface processor-channels
Page 1 of X
Page 1 of X
PROCESSOR CHANNEL ASSIGNMENT
Proc Gtwy Interface
Destination
Session Mach
Chan Enable Appl. To Mode Link/Chan
Node
Port Local/Remote ID
1:
n
_______
_
__ _____ _________ 0____ ___ ___ __
2:
n
_______
_ __ _____ _________ 0____ ___ ___ __
:
31:
y
dcs____ c 1_
0
node-1___
5003 31_ 13_ 1_
32:
y
dcs____ c 1_
0
node-1___ 6002 32_ 14_
2_
:
64:
n
_______
_
__ _____ _________ 0____ ___ ___ __
Field
Conditions/Comments
Processor Channel 31
: (ppp connection to Switch 1)
Enable
Set to
y
.
Appl.
Set to
dcs
for DCS signaling.
Mode
Node-3 is the “client” for this session. Set node-1 to “server”
(
(
s
).
Interface Link
This must match the link number assigned on the node-3 data
module screen.
module screen.
Interface Chan
A value of
0
allows any available interface channel to be used
for this connection. This number must match the Destination
Port number on the Switch-1 Processor Channel screen.
Port number on the Switch-1 Processor Channel screen.
Destination
Node
Node
Name of the far-end node for this channel. This must be a
name entered on the Node Names screen. For ppp
connections, it must match the Destination Node Name
entered on the ppp Data Module screen.
name entered on the Node Names screen. For ppp
connections, it must match the Destination Node Name
entered on the ppp Data Module screen.
Destination Port
This must match the Interface Channel number assigned on
the Switch-1 Processor Channel screen.
the Switch-1 Processor Channel screen.
1 of 2