Справочник Пользователя для Lucent Technologies Release 8.2

Скачать
Страница из 524
Configuration 4:  R8csi <—ISDN—> R8si Gateway 
<—ppp—> R8csi 
143
Administration for Network Connectivity
555-233-504 — Issue 1 — April 2000
CID: 77730
3  
C-LAN Administration
Switch 3 Task — Assign Processor Channels
This task associates data links (hardware) with processor channels (software) on 
Switch 3.
Begin
Steps
Open the Processor Channel Assignment form — enter  
ch com p
.
> Enter values
change communications-interface processor-channels
                                                                    Page 1 of X
PROCESSOR CHANNEL ASSIGNMENT
Proc                Gtwy        Interface  
 Destination 
Session    Mach
Chan Enable  Appl.  To  Mode  Link/Chan   
Node 
Port  Local/Remote  ID
  1: 
_______ 
_
__  _____  _________  0____  ___   ___    __
  2:
 n 
_______ 
 _     __  _____  _________  0____  ___   ___    __
  : 
31:  
y
 dcs____ c     1_
0
 node-1___
5003  31_   13_    1_
32:  
y  
dcs____ c     1_
0
 node-1___ 6002  32_   14_
 
2_
:
64:
 n 
_______ 
_
__  _____  _________  0____  ___   ___    __
Field
Conditions/Comments
Processor Channel 31
: (ppp connection to Switch 1)
Enable
Set to 
y
.
Appl.
Set to 
dcs
 for DCS signaling.
Mode
Node-3 is the “client” for this session. Set node-1 to “server” 
(
s
).
Interface Link
This must match the link number assigned on the node-3 data 
module screen.
Interface Chan
A value of 
0
 allows any available interface channel to be used 
for this connection. This number must match the Destination 
Port number on the Switch-1 Processor Channel screen.
Destination 
Node
Name of the far-end node for this channel. This must be a 
name entered on the Node Names screen. For ppp 
connections, it must match the Destination Node Name 
entered on the ppp Data Module screen.
Destination Port
This must match the Interface Channel number assigned on 
the Switch-1 Processor Channel screen.
1 of 2