Справочник Пользователя для Chief Manufacturing SL-236

Скачать
Страница из 24
6
Instruction Manual
SMART-LIFT 236 Electric Ceiling Lifts
PRETEST THE LIFT BEFORE INSTALLING
IMPORTANT:  Before mounting the lift in the ceiling, perform 
the following test to be sure that it operates properly and has 
not been damaged during shipping.
1.
Attach supports (not supplied) to the top of the lift (see 
Figure 1).
2.
Suspend the lift at least 3 1/2 feet high from a suitable structure 
[i.e. saw horses, ladders, or tables (see Figure 2)].
NOTE:  The supplied momentary push button and power cord can 
be used to pre-test the lift (see and “OUTSIDE TERMINAL 
WIRING EXAMPLES” on page 13).
3.
Cycle the lift through the “show” and “service” positions, mak-
ing sure the unit operates smoothly.
Figure 1. Support the Unit
Figure 2. Suspend the Unit