FX Series Programmable Controllers
Basic Program Instructions 2
2-5
2.5.2
Double Coil Designation
Double or dual coiling is not a recommended
practice. Using multiple output coils of the
s a m e   d e v i c e   c a n   c a u s e   t h e   p r o g r a m
operation to become unreliable. The example
program shown opposite identifies a double
coil situation; there are two Y3 outputs. The
following sequence of events will occur when
inputs X1 = ON and X2 = OFF;
1.The first Y3 tuns ON because X1 is ON. The
contacts associated with Y3 also energize
when the coil of output Y3 energizes. Hence,
output Y4 turns ON.
2.The last and most important line in this
program looks at the status of input X2. 
If this is NOT ON then the second Y3 coil does NOT activate. Therefore the status of the Y3
coil updates to reflect this new situation, i.e. it turns OFF. The final outputs are then Y3 = OFF
and Y4 = ON. 
Input durations:
The ON or OFF duration of the PLC inputs
must be longer than the operation cycle
time of the PLC.
Taking a 10 msec (standard input filter)
response delay into account, the ON/OFF
duration must be longer than 20 msec if
the operation cycle (scan time) is 10 msec.
Therefore, in this example, input pulses of
more than 25Hz (1sec/(20msec ON +
20msec OFF)) cannot be sensed.
There are applied instructions provided to
handle such high speed input requests.
: Input ON state NOT recognized
: Input ON state recognized
: Input OFF state NOT recognized
: 1 program processing
: Input processing
: Output processing
: A full program scan/operation cycle
X1
Y3
X2
1.
2.
Y3
Y3
Y4
Use of dual coils:
Always check programs for incidents of dual coiling. If there are dual coils the 
program will not operate as expected - possibly resulting in unforeseen physical 
The last coil effect:
In a dual coil designation, the coil operation designated last is the effective coil. That 
is, it is the status of the previous coil that dictates the behavior at the current point in 
the program.
1
2
3
5
6
4
4
7
t secs