Справочник Пользователя для Mitsubishi Electronics AJ61QBT11

Скачать
Страница из 294
 
 
 
11 - 14 
11   COMMUNICATION BETWEEN THE MASTER STATION AND THE 
LOCAL STATION 
MELSEC-QnA 
 
11.4 Performing the Data Link 
Turn on the power supply of the local station first, then the power supply of the master 
station to start the data link. 
 
11.4.1 Confirming the operation by LED display 
The following diagram shows the LED display status of the master station and the local 
station when the data link is performed normally. 
 
(1)   LED display of the master station 
Confirm that the LED display shows the following status: 
 
Module is normal.
Set as a master station.
Communicating with programmable
controller CPU.
The data link is proceeding normally.
The transmission speed is set to
2.5Mbps.
Sending data.
Receiving data.
A
J61QBT11
RUN
156K
ERR.
625K
MST
2.5M
S MST
5M
LOCAL
10M
CPU R/W
SW
M/S
TEST
PRM
S0
TIME
S1
LINE
S2
L RUN
SD
L ERR.
RD
B
R
A
T
E
T
E
S
T
E
R
R
O
R
 
 
(2)   LED display of the local station 
Confirm that the LED display shows the following status: 
 
Set as a local station.
The transmission speed is set to
2.5Mbps.
Module is normal.
Communicating with programmable
controller CPU.
The data link is proceeding normally.
Sending data.
Receiving data.
A
J61QBT11
RUN
156K
ERR.
625K
MST
2.5M
S MST
5M
LOCAL
10M
CPU R/W
SW
M/S
TEST
PRM
S0
TIME
S1
LINE
S2
L RUN
SD
L ERR.
RD
B
R
A
T
E
T
E
S
T
E
R
R
O
R