Справочник Пользователя для Samsung SPH-I330

Скачать
Страница из 206
133
Checking OFF To Do List Items
When items are completed, they can be checked off to indicate the item 
has been completed.
Checking off a Completed Item
1.
Tap the check box located on the left side of the “To Do List” item.
Note: 
The To Do List can be set to display or hide items that have already 
been checked off. By default, completed items will not be displayed but 
are always stored until you delete them.
Changing Priorities and Due Dates
You can change the To Do List to display the due date assigned to an 
item, change its priority, and assign a category to the task with the To Do 
Item Details dialog box. 
You can then sort To Do List items by priority, due date, or category.
Changing the Priority, Due Date and Category
1.
In the To Do List, tap the desired item.
2.
Tap the 
Details
 button.
3.
In the Details dialog box, tap the 
Category
 drop down menu. Select 
the desired category, or create a new one.
4.
In the Details dialog box, tap the 
Due Date
 drop down menu. 
Choose one of the following options:
Today
 - Automatically inserts the date in the “Due Date” field.