Справочник Пользователя для Mitsubishi Electronics A1SJ61BT11

Скачать
Страница из 294
 
 
 
7 - 19 
7   DATA LINK PROCEDURE 
MELSEC-QnA 
 
7.8 Checking the Connection Condition (Line Test) 
The Line Test is performed after all modules are connected with CC-Link dedicated 
cables to check if the connection is correctly established to perform data link with each 
remote, intelligent device, local, and standby stations. 
 
POINT 
 
Line Test 2 is performed when an error has occurred in Line Test 1. 
Therefore, there is no need to perform Line Test 2 if no error was detected in Line Test 1. 
 
7.8.1 Checking connection and communication status with remote station/local 
station/standby master station (line test 1) 
Confirms if data link can be performed normally with all (64 stations) the remote, local, 
and standby master stations. 
Perform Line Test by following the procedure below: 
 
Continued to the next page
Start
Set the master module's "mode setting switch" 
to "3". 
The test is started after approximately four 
seconds.  (The "TEST" LED turns on.)...Only AJ61QBT11
For AJ61QBT11: 
Po
we
r s
u
pp
ly
QnACPU
AJ61
QBT11
For A1SJ61QBT11:
Operate the RUN/STOP key switch and the 
RESET key switch of QnACPU in the following 
procedure: 
P
o
we
r supply
Q2ASCPU
A1S
J61
QBT11
Operate the RUN/STOP key switch of the 
Q2ASCPU in the following procedure: 
STOP
STOP
RESET
Set the RUN/STOP key 
switch to "STOP".
Reset the module using the 
RESET key switch.
.........Set "0 (online)" at local stations.