Справочник Пользователя для Mitsubishi Electronics -QS90SR2SP-CC

Скачать
Страница из 96
5
SETTINGS AND PROCEDURES BEFORE 
OPERATION
5.2 CC-Link Safety Relay Module
5.2.1 Start-up procedures
5
 - 10
1
O
V
ER
VI
E
W
2
S
YST
EM
 
CONF
IGURA
T
ION
3
S
P
E
C
IF
ICA
T
IONS
4
F
UNCT
IO
NS
5
S
E
T
T
INGS
 A
ND 
PR
O
C
E
DURES
 BEF
ORE 
OP
E
R
A
T
ION
6
T
R
O
U
BL
ESH
O
O
T
ING
AP
PENDI
X
Figure 5.7 Start-up procedures (2/2)
POINT
When powering ON the system, make sure to power ON the safety power supply 
first, and then the module power supply.
If the module power supply is powered ON first, monitor signals cannot be read 
properly.
For details, refer to Section 6.2.
Start-up mode
Auto mode
Manual mode
Start-up mode
Auto mode
Manual mode
Check the wiring and settings.
Power-ON
Turn ON the start-up switch.
Check the operating status with 
LED and others.
End
Connect the start-up switch between 
XS0 and XS1.
(From previous page)
Connect normally closed contact of 
the electromagnetic switch to off check.
Yes
No
Connect electromagnetic 
switch to output?