Справочник Пользователя для Mitsubishi Electronics -QS90SR2SP-CC
5
SETTINGS AND PROCEDURES BEFORE
OPERATION
5.2 CC-Link Safety Relay Module
5.2.1 Start-up procedures
5
- 10
1
O
V
ER
VI
E
W
2
S
YST
EM
CONF
IGURA
T
ION
3
S
P
E
C
IF
ICA
T
IONS
4
F
UNCT
IO
NS
5
S
E
T
T
INGS
A
ND
PR
O
C
E
DURES
BEF
ORE
OP
E
R
A
T
ION
6
T
R
O
U
BL
ESH
O
O
T
ING
AP
PENDI
X
Figure 5.7 Start-up procedures (2/2)
POINT
When powering ON the system, make sure to power ON the safety power supply
first, and then the module power supply.
If the module power supply is powered ON first, monitor signals cannot be read
properly.
For details, refer to Section 6.2.
first, and then the module power supply.
If the module power supply is powered ON first, monitor signals cannot be read
properly.
For details, refer to Section 6.2.
Start-up mode
Auto mode
Manual mode
Start-up mode
Auto mode
Manual mode
Check the wiring and settings.
Power-ON
Turn ON the start-up switch.
Check the operating status with
LED and others.
LED and others.
End
Connect the start-up switch between
XS0 and XS1.
XS0 and XS1.
(From previous page)
Connect normally closed contact of
the electromagnetic switch to off check.
the electromagnetic switch to off check.
Yes
No
Connect electromagnetic
switch to output?