Справочник Пользователя для Siemens G120
Automation and Drives - SCE
T I A Training Document
Page 147 of 147
Module
H01
Issued: 02/2008
Frequency Converter SINAMICS G120 on PROFIBUS DP and PROFINET
Preface Notes Startup with PROFIBUS Startup with PROFINET Program Example
6.7
Load the blocks for controlling the bucket elevator to the CPU 315-2DP
10. In the folder ’Blocks’, highlight ’OB1’, ’FC10’, ’DB20’ and ’DB21’. Load them to the CPU315F-
10. In the folder ’Blocks’, highlight ’OB1’, ’FC10’, ’DB20’ and ’DB21’. Load them to the CPU315F-
2PN/DP.(
→ OB1 → FC10 → DB20 → DB21 →
)
After the blocks have been transferred, the program can be started.