Справочник ПользователяСодержаниеHAZARD DEFINITIONS2PLEASE READ BEFORE PROCEEDING3Boiler Operating Control Module43SAFETY INFORMATION4Line Voltage Connections44Low Voltage Connections44RATINGS8Wiring of the Cascade45Low Voltage Field Wiring Connections46Location of Unit9Recommended Service Clearances9Check/Control Water Chemistry47Non-Combustible / Combustible Flooring10Freeze Protection (when used)47Combustion Air Options10Fill and Test Water System47Purge Air from Water System47Before You Begin13Check for Gas Leaks47Vent System Options14Check Thermostat Circuit(s)48General Venting Information15Check Vent and Air Piping48Conventional Negative Draft Venting16Placing the Boiler in Operation48Vertical DirectAire Venting19Start the Boiler48Sidewall Venting22If Boiler Does Not Start Correctly48Horizontal DirectAire Venting25Set Space heating Operation (boiler only)48Direct Venting26Operating Instructions49Outdoor Installation30Set DHW Operation50Connecting to Gas Supply31General51Gas Pressure Test31Cascade53Checking Manifold Gas Pressure31Sequence of Operation55Combination Gas Valves32Copper-fin II Control Module56Checking Gas Supply Pressure33Access Modes57Saving Parameters57Inlet & Outlet Connections34Status Display Screens58Relief Valve35Heating Boiler Installations35Initial Setup of Maximum Water Flow62Low Temperature Return Water Systems36Water Chemistry63Low Temperature Bypass Requirements36Typical Water Heater Piping w/Storage Tank(s)64Three Way Valves in System37Multiple Water Heater Piping w/Storage Tank(s)66Radiant Floor and Snow Melt Heating Systems37Pump Operation68Typical Heating Boiler Installations38Minimum Water Temperatures (domestic hot water)69Installation with a Chilled Water System389. MAINTENANCE71Primary/Secondary Piping of a Single Boiler3910. CONNECTION DIAGRAM76Primary/Secondary Piping of Multiple Boilers4011. LADDER DIAGRAM78Boiler w/Low Temperature Bypass Piping41Primary/Secondary Piping with Buffer Tank42Размер: 7,6 МБСтраницы: 80Язык: EnglishПросмотреть