Справочник ПользователяСодержаниеDaily Startup26I. MODEL IDENTIFICATION1Power Failure26SERIES PS540 ELECTRICAL SPECIFICATIONS2B. Shutdown Procedure26II. PRINCIPLE OF AIR FLOW3A.Daily Startup Procedure26A. Heat Transfer and How It Works3IV. NORMAL OPERATION - STEP-BY-STEP26II. PRINCIPLE OF AIR FLOW (Continued)4V. QUICK REFERENCE: TROUBLESHOOTING30B. Air Fingers4III. COMPONENT FUNCTION5A. Conveyor Motor and Conveyor Belt6I. MAINTENANCE - DAILY32B. Blower Fan6A. Exterior32C. Gas Burner6B. Cooling Fan32D. Window6C. Conveyor Belt32E. Cooling Fan7D. Crumb Pans32F. Air Fingers and Blank Plates - See Figure 1-98E. Window32II. MAINTENANCE - MONTHLY33I. UNLOADING9B. Air Fingers Disassembly For Cleaning35REQUIRED KITS AND EQUIPMENT10C. Cleaning the Window36D. Reassembly of Air Fingers36INSTALLATION KIT P/N 5063310E. Reinstall End Plugs39F. Conveyor Reassembly Into Oven40OPTION - BASE W/15″″ LEGS & TOP P/N 3483211G. Checking Conveyor Belt Tension40H. Conveyor Belt Link Removal41I. Replacing Conveyor Belt42CASTERS & TOP P/N 3483312J. Attaching Drive Chain42III. MAINTENANCE - EVERY 3 MONTHS43A. Cleaning the Blower/Fan Motor43P/N 3483113B. Electrical Terminals44RESTRAINT CABLE INSTALLATION16C. Ventilation44D. Checking the Blower/Fan Belt44FOR PS540-SERIES OVENS17E. Blower Fan Shaft Bearing Lubrication45ELECTRICAL SAFETY SWITCH17F. Split-belt Conveyor Shaft Cleaning45ELECTRICAL SPECIFICATIONS17IV. MAINTENANCE - EVERY 6 MONTHS47GAS RATING17MINIMUM GAS METER RATING17KEY SPARE PARTS KIT48MINIMUM GAS PIPE SIZE17GAS SAFETY VALVE17Troubleshooting Charts49REQUIRED GAS SUPPLY PRESSURE17SUGGESTED17OVEN PANELS, WINDOW AND LEGS53User supplied Items17CONTROL PANEL55II. VENTILATION GUIDELINES18BLOWER AND SHROUD57VENTILATION HOOD18CONVEYOR59VENTILATION CAPTURE TEST18SPLIT BELT CONVEYOR61GAS BURNER AND PIPING ASSEMBLY63PS540-SERIES OVENS.19MACHINERY COMPARTMENT65IV. ELECTRIC SUPPLY FOR GAS-HEATED OVENS19V. GAS SUPPLY FOR GAS HEATED OVENS20Wiring Diagram, G208-240 50/60, 1PH 3W PS54067END STOP INSTALLATION22I. CONTROL FUNCTIONS23II. COMPONENT INFORMATION AND LOCATION24A. Door Safety Switch24B. Blower Switch24C. Heat Switch24D. Temperature Controller24E. Conveyor25MEASURING CONVEYOR SPEED.25III. STEP-BY-STEP OPERATION26A. Startup Procedures26Размер: 6,5 МБСтраницы: 76Язык: EnglishПросмотреть