Teledyne Percent Oxygen Analyzer 用户手册

下载
页码 51
Percent Oxygen Analyzer  
Maintenance 
 
 
 Teledyne 
Analytical 
Instruments 
41
 
Maintenance 
Aside from normal cleaning and checking for leaks at the probe 
connection, the Model 9060L should not require any maintenance 
beyond replacement of a blown fuse. Routine maintenance includes 
occasional recalibration, as described in Chapter 4, Operation
5.1 Replacing the Fuse 
CAUTION: 
REMOVE POWER TO UNIT BEFORE REPLACING 
THE FUSE. 
 
 
When a fuse blows, check first to determine the cause, then replace 
the fuse using the following procedure: 
1.  Disconnect the AC power and place the power switch located on 
the rear panel in the O position. Remove the power cord from the 
receptacle. 
2.  The fuse receptacle is located in the power cord receptacle 
assembly in the upper left-hand corner of the rear panel. See 
Figure 5-1. 
 
Figure 5-1: AC Fuse Replacement