KitchenAid FRONT-LOADINGGAS DRYER 用户手册

下载
页码 72
11
Determine vent path
Select the route that will provide the straightest and most 
direct path outdoors. 
Plan the installation to use the fewest number of elbows and 
turns. 
When using elbows or making turns, allow as much room as 
possible. 
Bend vent gradually to avoid kinking. 
Use the fewest 90° turns possible.
Determine vent length and elbows needed for best 
drying performance
Use the Vent system chart below to determine type of vent 
material and hood combinations acceptable to use.
NOTE: Do not use vent runs longer than those specified in 
the Vent system chart. Exhaust systems longer than those 
specified will:
Shorten the life of the dryer.
Reduce performance, resulting in longer drying times and 
increased energy usage.
The Vent system chart provides venting requirements that will 
help to achieve the best drying performance.
Vent system chart
NOTE: Side and bottom exhaust installations have a 90º turn 
inside the dryer. To determine maximum exhaust length, add one 
90º turn to the chart.
Install Vent System
1. Install exhaust hood. Use caulking compound to seal exterior 
wall opening around exhaust hood.
2. Connect vent to exhaust hood. Vent must fit inside exhaust 
hood. Secure vent to exhaust hood with 4" (10.2 cm) clamp.
3. Run vent to dryer location. Use the straightest path possible. 
See “Determine vent path” in “Plan Vent System.” Avoid 90º 
turns. Use clamps to seal all joints. Do not use duct tape, 
screws or other fastening devices that extend into the interior 
of the vent to secure vent.
Install Leveling Legs
1. To protect the floor, use a large flat piece of cardboard from 
the dryer carton. Place cardboard under the entire back edge 
of the dryer. 
2. Firmly grasp the body of the dryer. Gently lay the dryer on the 
cardboard. See illustration.  
3. Examine the leveling legs. Find the diamond marking. 
4. Screw the legs into the leg holes by hand. Use a wrench to 
finish turning the legs until the diamond marking is no longer 
visible.
5. Place a carton corner post from dryer packaging under each 
of the 2 dryer back corners. Stand the dryer up. Slide the 
dryer on the corner posts until it is close to its final location. 
Leave enough room to connect the exhaust vent or gas line.
For mobile home use
Gas dryers must be securely fastened to the floor at the time of 
installation.
Mobile home installations require a Mobile Home Installation Kit. 
For more information, please reference the service numbers in 
the “Assistance or Service” section of this manual.
Number of 
90º turns 
or elbows
Type of
vent
Box or 
louvered 
hoods
Angled
hoods
0
Rigid metal
Flexible metal
64 ft (20 m)
36 ft (11 m)
58 ft (17.7 m)
28 ft (8.5 m)
1
Rigid metal
Flexible metal
54 ft (16.5 m) 
31 ft (9.4 m)
48 ft (14.6 m)
23 ft (7 m)
2
Rigid metal
Flexible metal
44 ft (13.4 m)
27 ft (8.2 m)
38 ft (11.6 m)
19 ft (5.8 m)
3
Rigid metal
Flexible metal
35 ft (10.7 m)
25 ft (7.6 m)
29 ft (8.8 m)
17 ft (5.2 m)
4
Rigid metal
Flexible metal
27 ft (8.2 m)
23 ft (7 m)
21 ft (6.4 m)
15 ft (4.6 m)
WARNING
Excessive Weight Hazard
Use two or more people to move and install dryer.
Failure to do so can result in back or other injury.