IBM 5078 用户手册

下载
页码 70
__ g.
Press the Enter push button on the control panel.
__ h.
Press the Mode Select button until the Normal indicator (OK)
lights up.
__ i.
Press the Increment/Decrement push button until
01 appears
in the Function/Data display.
__ j.
Press the Enter push button on the control panel.
01 B S should appear in the Function/Data display and OK is
illuminated. If it does not, repeat steps 5a on page 27 through
5i.
__ k.
Go to step 6.
__ 6.
Power on your system unit by pushing the white power-on button.
Note:
The time needed to do a complete IPL varies depending on iSeries
model and configuration.
__ 7.
Sign on your system unit. Ensure that you have service tools authority.
__ 8.
28
Setting up your 0578, 5074, 5078 or 5079 Expansion Unit V5R2