Carrier 48MA/50ME016-040 用户手册

下载
页码 48
SAFETY CONSIDERATIONS
Installation and servicing of air-conditioning equipment
can be hazardous due to system pressure and electrical com-
ponents. Only trained and qualified service personnel should
install, repair, or service air-conditioning equipment.
Untrained personnel can perform basic maintenance func-
tions of cleaning coils and filters and replacing filters. All
other operations should be performed by trained service per-
sonnel. When working on air-conditioning equipment, ob-
serve precautions in the literature, tags and labels attached
to the unit, and other safety precautions that may apply.
Follow all safety codes, including ANSI (American
National Standards Institute) Z223.1. Wear safety glasses and
work gloves. Use quenching cloth for unbrazing operations.
Have fire extinguisher available for all brazing operations.
Before performing service or maintenance operations on
unit, turn off main power switch to unit. Electrical shock
could cause personal injury.
Do not try to light any appliance. Do not touch any elec-
trical switch; do not use any phone in your building.
Immediately call your gas supplier from a neighbor’s
phone. Follow the gas supplier’s instructions. If you can-
not reach your gas supplier, call the fire department.
Do not store or use gasoline or other flammable vapors
and liquids in the vicinity of the 48MA unit or any other
gas-fired appliance.
Improper installation, adjustment, alteration, service, or
maintenance can cause injury or property damage. Re-
fer to this manual. For assistance or additional infor-
mation, consult a qualified installer, service agency, or
the gas supplier.
Disconnect gas piping from 48MA unit when leak test-
ing at pressures greater than 0.5 psig. Pressures greater
than 0.5 psig will cause gas valve damage resulting in
a hazardous condition. If gas valve is subjected to pres-
sure greater than 0.5 psig, it must be replaced. When
pressure testing field-supplied gas piping at pressures of
0.5 psig or less, the unit connected to such piping must
be isolated by manually closing the gas valve.
INSTALLATION
General —
Install unit on rooftop, outdoor site only. In-
stall unit, electrical wiring, gas supply line (48MA) and con-
densate drain lines in accordance with all applicable codes.
Unit Clearances —
See Fig. 1 and 2 for service and
airflow clearances. For 48MA gas-fired units, provide not
less than 36-in. clearance to combustibles from top and all
sides. Keep burner end free from any obstruction.
Locate exit terminals of mechanical draft system (48MA
flue outlet) as follows:
• Not less than 12 in. from any opening through which com-
bustion products could enter the building.
• Not less than 2 ft from any adjacent building.
• Not less than 7 ft above grade when unit is adjacent to
public walkways.
Roof Curb —
Assemble and install per instructions shipped
with this accessory. Information required to field fabricate a
roof curb and other curb data are shown in Fig. 3-5.
Install field-supplied insulation, cant strips, roofing and
counter flashing as required. Seal all curb joints with mastic
or other suitable roof cement to keep out moisture. Be sure
that run-off pan at compressor end of curb is completely flashed
and sealed.
Seal strip (Fig. 3) is shipped with accessory roof curb. In-
stall as described in the roof curb installation instructions.
The seal strip compresses under unit weight so that an air-
tight seal and vibration isolation are provided between unit
base and curb.
Roof Openings —
Except for the compressor and con-
denser section, roof area under the unit need not be filled in
as the curb-mounted unit encloses this space. Leaving this
roof section open provides ample clearance for ductwork,
piping, and power and control wiring.
If the roof area inside curb is to be filled in so that roof
deck and bottom of base unit can be used as a return-air ple-
num, any spaces under the curb flanges caused by corru-
gated roofing or roof irregularities must be sealed to prevent
water seepage. If spaces are not sealed, the negative pres-
sure of return air may draw water under the unit and into the
building structure.
If openings are cut in a finished roof, provide at least 6-in.
space on each of the longer sides of the supply and return air
openings. Due to interference from the roof curb structure,
this additional clearance may not be possible on the short
sides.
2