All installations and services must be performed by qualified service personnel. 
 
23 
Figure 6: Typical Gas Piping  
 
 
1.  INSTALLATION OF NATURAL GAS PIPING 
 
The installation of the gas piping and the following test procedures must be 
performed by a qualified installer or service person. 
 
The following chart may be used as a guide in sizing natural gas supply piping. 
The input loading of all gas appliances installed on any main or trunk line must 
be totaled to determine its required carrying capacity. 
 
EXAMPLE:  A line must supply a furnace of 100,000 BTU/hr input, a hot water 
heater of 40,000 BTU/hr input and gas range with a 30,000 BTU/hr input 
capacity. The total BTU/hr input loading on the line is 170,000 BTU/hr. The 
200,000 BTU/hr column on the chart must be used in sizing the pipe. 
 
 
 
 
MHA1 SERIES
SEDIMENT TRAP
GROUND JOINT
STREET ELBOW
GAS VALVE
1
8
" N.P.T. MANIFOLD 
PRESSURE TAP
5 FT.
MANUAL GAS 
SHUT OFF VALVE
NOTE:
ACTUAL UNIT MAY
DIFFER SLIGHTLY 
FROM WHAT IS SHOWN.