Thermo Products MHA1-125N 用户手册

下载
页码 61
All installations and services must be performed by qualified service personnel. 
 
29 
Table 6: Blower delay settings for heating cycles 
 
To delay fan 
turn-on by: 
 
           Set Switch 
   #1                      #2 
15 sec. 
30 sec. 
*45 sec. 
60 sec, 
Off                    Off 
Off                    On 
On                     Off 
On                     On 
 
 
To delay fan 
turn-off by: 
 
Set Switch 
#3                 #4 
60 sec. 
90 sec. 
120 sec. 
*180 sec. 
On                 On 
Off                On 
On                 Off 
Off                 Off 
*Factory settings for optimal performance 
 
 
 
III. Initial Operation of the Furnace:
 
A.  Initial Startup: 
 
 
•  Turn off power to furnace. Before the gas piping system is placed 
into service, it must have been leak tested by a qualified heating 
contractor.
 (Refer to the General Gas Piping Requirements section of 
this manual regarding the installation and leak testing of gas piping). 
 
•  For initial start-up of the appliance after installation, it may be 
necessary to purge the air out of the gas line. A qualified heating 
contractor should do this. If excessive gas escapes when purging 
the gas supply at a pipe union joint, allow the gas to disperse for at 
least 15 minutes before attempting to start the appliance. LP gases 
are especially dangerous because the specific gravity of LP gases 
allows them to accumulate at ground level at possibly explosive 
concentrations.
  
 
Review the following items before the initial startup. It may be helpful to review 
the Sequence of Operations in Appendix B of this manual, also. 
 
a.  Check all wiring for loose connections and proper hook-up. Refer to the 
connection diagram.