Wayne-Dalton 9100 用户手册

下载
页码 40
36
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your 
local yellow pages/business listings or go to the 
Find a Dealer section online at www.wayne-dalton.com
Tools Needed:
Trolley operator
OPERATOR MUST bE TESTED 
AT TIME Of INSTALLATION 
AND MONTHLY THEREAfTER 
AS DESCRIbED IN YOUR 
INSTALLATION INSTRUCTIONS 
AND OWNER’S MANUAL, TO 
ENSURE THAT DOOR SAfETY 
fEATURES fUNCTION. fAILURE 
TO TEST OR MAkE ANY 
NECESSARY ADjUSTMENTS OR 
REPAIRS, CAN RESULT IN SEVERE 
OR fATAL INjURY.
1.  Install operator rail 1/2” to 1-1/2” 
 
(13 - 38 mm) above high arc of top 
 
section of the door.
2.  Mount operator to ceiling so that 
 
1” to 1-1/2” (25 - 38 mm) 
 
clearance is maintained between 
 
trolley rail and top section when 
 
door is fully open (trolley rail will 
 
slope down towards rear).
3.  Attach door arm to operator bracket.
4.   Attach operator rail to suitable    
 
mounting surface, 2 x 6 lumber    
 
minimum.
5.  Attach operator to ceiling using 
 
perforated angle.
 
imPoRTaNT: ANGLES MUST bE 
SECURELY ATTACHED TO SOUND 
fRAMING MEMbER(S).
OPERATOR
fRAMING MEMbERS
PERfORATED ANGLE
OPERATOR 
RAIL
PERfORATED 
ANGLE
OPERATOR RAIL
waRNiNg
SUITAbLE MOUNTING 
SURfACE 2 X 6 
LUMbER MINIMUM
DOOR ARM TO 
OPERATOR bRACkET
HEADER
HAIRPIN 
COTTER
OPERATOR     
bRACkET
DOOR 
ARM
5/16” X 1-1/4” 
CLEVIS PIN
OPERATOR     
bRACkET TAbS
DOOR ARM
TOP VIEW
HAIRPIN COTTER       
(OUTSIDE Of 
OPERATOR 
bRACkET TAb)
OPERATOR 
bRACkET TAbS