Initial Installation
QUALIFIED INSTALLERS ONLY
STEP 5.  Cut hole in the roof centered on the small hole placed in the roof from Step 2. The hole should 
be of sufficient size to meet minimum requirements for Clearance to Combustibles, as specified. 
Continue to assemble lengths of pipe and elbows necessary to reach from the ceiling support 
box up through the roof line. Galvanized pipe and elbows may be utilized in the attic, as well 
as above the roof line. The galvanized finish is desirable above the roof line, due to the higher 
corrosion resistance.
STEP 6.  Once the pipe sections have been joined, and run up through the hole in the roof, slip an elbow 
strap over the exposed sections, bend the support straps outwards, and push the elbow strap 
down to the roof level, as shown in Figure 34. Tighten the clamp around the pipe section. Use 
a level to make sure the pipe is truly vertical. With roofing nails, secure the support straps to 
the roof. Seal the nails holes heads with non-hardening mastic. Trim the excess length of the 
support straps that extend out beyond the edge of the flashing.
STEP 7.  Slip the  flashing over  the  pipe section  protruding through the  roof.  Secure  the  base  of  the 
flashing to the roof with roofing nails. Use a non-hardening sealant between the uphill edge 
of the flashing and the roof. Insure the roofing material overlaps the top edge of the flashing. 
Verify that you have at least the minimum clearance to combustibles at the roof line.
STEP 8.  Continue  to  add  pipe  sections  until  the  height  of  the  vent  cap  meets  the  minimum  code 
requirements. Refer to Figure 35 and Table 8. Note that for steep roof pitches, the vent height 
must be increased. In high wind conditions, nearby trees, adjoining roof lines, steep pitched 
roofs,  and  other  similar  factors  can  result  in  poor  draft,  or  down  drafting.  In  these  cases, 
increasing the vent height may solve the problem.
STEP 9.  Slip the storm collar over the pipe, and push it down to the top of the roof flashing as shown 
in Figure 34. Use the non-hardening sealant around the joint between the pipe and the storm 
collar.
STEP 10. Twist-lock the vent cap.
Table 8: Minimum ‘H’ for Figure 35.
Roof Pitch
Minimum Height (H)
Feet
Meters
Flat to 7/8
1
0.3
Over 7/12 to 8/12
1.5
0.46
Over 8/12 to 9/12
2
0.61
Over 9/12 to 10/12
2.5
0.76
Over 10/12 to 11/12
3.25
0.99
Over 11/12 to 12/12
4
1.22
Over 12/12 to 14/12
5
1.52
Over 14/12 to 16/12
6
1.83
Over 16/12 to 18/12
7
2.13
Over 18/12 to 20/12
7.5
2.29
Over 20/12 to 21/12
8
2.44
Figure 35: Height of Vertical Termination; 
Reference Table 8.