Enviro C-10794 用户手册

下载
页码 45
21
(2)   Any occupied areas above the first floor, including 
closets and storage spaces, which the vertical vent 
passes  through,  must  be  enclosed.  The  enclosure 
may  be  framed  and  sheet  rocked  with  standard 
building  materials.  However  consult  the  appliance 
manufactures installation instructions for the minimum allowable clearance between the outside of 
the vent pipe, and the combustible surfaces of the enclosure. Do not fill any required air spaces with 
insulation.
C
ATHEDRAL
 C
EILING
 I
NSTALLATION
:
STEP 1.  Follow installation steps 1 & 2 under I
NITIAL
 I
NSTALLATION
 - V
ERTICAL
 I
NSTALLATION
.
STEP 2.  Using the plumb bob, mark the centerline of the venting system on the ceiling and drill a small 
hole through the ceiling and roof at this point. From the roof, locate the drill hole and mark the 
outline of the “Cathedral Ceiling Support Box”.
STEP  3.  Remove  shingles  or  other  roof  coverings  as  necessary  to  cut  the  rectangular  hole  for  the 
“Support Box”. Cut the hole 1⁄8” larger than the “Support Box” outline.
STEP 4. Lower the “Support Box” through the hole in the roof until the bottom of the “Support Box” 
protrudes at least 2 inches (5 cm) below the ceiling. Align the “Support Box” both vertically and 
horizontally with a level as shown in Figure 28. Temporarily tack the “Support Box” in the place 
through the inside walls and into the roof sheathing.
STEP 5. Using tin snips, cut the “Support Box” from the top corners down to the roof line, and fold the 
resulting flaps over the roof sheathing (Figure 29). Before nailing it in to the roof, run a bead of 
non-hardening mastic around the top edges of the “Support Box”, to make a seal between the 
box and the roof. Clean out any combustible material from the inside of the “Support Box”.
Figure 26: Use of Wall Straps.
Figure 27: Multi-Story Vent Pipe Installation.
Initial Installation
QUALIFIED INSTALLERS ONLY