Enviro EG-40 用户手册

下载
页码 17
12. PARTS AND ACCESSORIES 
 
Service Parts available from your local Envirogas Dealer 
 
Burner Control Assembly 
Natural Gas Pilot Assembly 
Propane Pilot Assembly 
Door Bolt 
Relief Door Gasket 
Regulating Valve 
Piezo Igniter 
Burner Switch 
B-vent Spill switch 300
°F(149°C) MR. 
Orifice Blank 
Convection Blower 
Light Bulb Holder 
Light Switch (momentary) 
Fan Controller  
Log Set (with Embers) 
Thermocouple 
Embers 
Thermopile 
Door Gasket 
Convection Fan Sensor 120 F (49C) 
 
Accessories 
Gold trim Package  
Low Voltage Thermostat 
 
 
REMOVING or LUBRICATING THE BLOWER 
The blower should be lubricated every 12 
mos. 
 
1.  Turn the unit off and remove the log set.  
 
2.  Remove the burner tray assembly by removing 
the screw on either side of the tray, between the 
front and rear burners.  Lift the tray out.  Remove 
the brick liner by undoing the screw on either 
side and sliding the panel out. 
 
3.  Remove the 4-5/16” bolts that hold the blower 
mounting plate to the back firewall. Use a light 
lubricating oil on screws before removal. 
 
 
4.  Carefully pull the blower assembly into the firebox, exposing the blower lubricating holes (located on the top of the 
motor housing on either side of the label).  Add 2 drops of SAE 20 oil. 
 
5.  If removal of the blower is necessary, disconnect the blower leads from the harness.  Remove the blower. 
 
6.  To re-install, check mounting plate gasket and reverse steps 1 through 4.
 
 
 
14