Enviro DV50DX 用户手册

下载
页码 36
Secondary Installation
L
OG
 S
ET
 A
SSEMBLY
:
Figure 35: The first log to be placed 
is  the  front  right  log.  The  back 
end has a hole that sits on the right 
burner  pin  (see  Figure  34)  and  the 
front has a notch that helps it rest on 
the center of the grate against one of 
the vertical bars. Second to be placed 
is the  bottom log. The bottom  log 
rests on the center and right ledge in 
the  firebox  (see  Figure  34)  and  the 
large  end  must  be  flat  against  the 
right brick liner.
Figure  36:  The  back  left  log  rests 
on the left ledge in the firebox (see 
Figure 34) and the left ledge on the 
bottom log (see Figure 35). The large 
end must be flat against the left brick 
liner.
Figure  37:  The  top  of  the  far  left 
log has a hole that rests on the pin 
and  ledge  of  the  back  left  log  (see 
Figure 36). The bottom of the far left 
log rests against the base of the left 
andiron.  The  top  of  the  far  right 
log has a hole that rests on the right 
pin and ledge of the bottom log (see 
Figure 35) and the bottom of the far 
right log rests against the base of the 
right andiron.
Figure 35.  First Stage Log Set Installation
Figure 36.  Second Stage Log Set Installation
Figure 37.  Third Stage Log Set Installation
27